What are you looking for?

Filter:

Construction | 2024

Floodlighting of Large Scale Decommissioning Works...

Project number: SP113

The dismantling and decommissioning of a large industrial complex can be a lengthy and dangerous process...

Read more

Aviation | 2024

High Current RCD & Monitored Earth...

Project number: SP111

We manufacture a standard range of socket outlet assemblies rated up to 63A

Read more

Construction | 2023

Tunnel Distribution Assembly, 630A

Project number: SP103

A recent requirement for free-standing, 400V tunnel distribution assemblies, which are to supply temporary Low Voltage...

Read more

Construction | 2022

Tunnel Distribution Assembly, 400A

Project number: SP098

Tunnel Boring Machines allow very long tunnels to be bored at an incredible pace, tirelessly working,...

Read more

Tunnelling | 2022

Tunnel Transformer, 125kVA, 3300:400V, with Fire...

Project number: SP097

Over the last 12 months the Blakley team has been heavily involved in supplying equipment to...

Read more

Tunnelling | 2022

800A Mains Distribution Assembly (MDA) for...

Project number: SP094

Blakley Electrics has a close connection with the tunnelling sector, which dates back well over 30...

Read more

Tunnelling | 2021

3300V Tunnel Transformer with 400V and...

Project number: SP084

The UK tunnelling sector is currently experiencing a very high level of activity thanks to demand...

Read more

Construction | 2021

Ultra High Output LED Floodlights

Project number: SP079

The installation of highly efficient LED floodlights for local area lighting has been universally accepted on...

Read more

Tunnelling | 2020

Tunnel Mains Distribution Assembly, 800A

Project number: SP076

Although standard Mains Distribution Assemblies (MDA) are commonly used on tunnel projects, we often produce variations...

Read more

Tunnelling | 2020

Tunnel Transformers, 3300V

Project number: SP073

Given the crowded nature of the UK's major cities and the environmental impact of large scale...

Read more

Construction | 2018

1000V Tunnel Power Distribution

Project number: SP056

The Blakley team has recently been involved in a project to provide 400V and 110V power...

Read more

Rail | 2015

New Generation of Tunnel Power Transformers,...

Project number: SP030

At the end of 1992 Blakley Electrics secured its first significant order from London Underground, which...

Read more

Contact us

Are you ready to discover your high performance power and lighting solutions?

Go to Top